Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Black & Veatch’s permitting & design expertise helps expand an EV charging network

By Paul Dvorak | October 2, 2017

As all-electric cars (EVs) increase in wider use, a critical issue for drivers is having sufficient charging resources to stay on the road during longer trips, not to mention paying for the power.

San Francisco, California-based Volta Charging aims to help alleviate range anxiety by rapidly scaling its portfolio of free public electric car charging stations.

Establishing the charging stations requires obtaining dozens of local government permits, meeting the needs of businesses where stations are located, and considering variable construction requirements at every physical location. 

“The idea is to put these stations out in front of the community, enticing the public with the idea of converting to electric cars, making their communities more sustainable,” said Scott Mercer, Volta Charging founder and chief executive officer.

The company tested the concept in Hawaii in 2010, and in 2014 it moved to California, installing chargers in the parking lots of malls, grocery stores, and sports venues.

Volta doubled its number of charging stations during the past six months, with more than half of its install base in California. Its goal is to also add two new networks by the end of the year, spanning from the Northwestern U.S. to Washington, D.C.

But rapid growth isn’t easy, and Volta executives realized they needed help with permitting and design to reach their goals.

The work requires obtaining dozens of local government permits, meeting the needs of businesses where stations are located, and considering variable construction requirements at every physical location.

Black & Veatch brings the engineering and permitting expertise Volta needs to bring many of its charging stations to life as quickly as possible. In some cases, Black & Veatch has obtained permits and brought units online in about a month.


Filed Under: News
Tagged With: black & veatch
 

About The Author

Paul Dvorak

Related Articles Read More >

US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition

Digital Edition

Browse the most current issue of Windpower Engineering & Development and back issues in an easy to use high quality format. Clip, share and download with the leading wind power engineering magazine today.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe