Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

BLM to overhaul wind, solar rights-of-way regulations

By Paul Dvorak | October 10, 2014

This article, from law firm Beveridge & Diamond PC, is authored by John G. Cossa.

John_G_CossaThe Department of the Interior’s Bureau of Land Management (“BLM”) intends to publish in the September 30 Federal Register a proposed rule that, if adopted, could significantly alter the landscape of wind and solar energy development on BLM-managed land. The changes contemplated in the proposal have been in the works for more than five years, and would remake much of the agency’s regulations governing the acquisition of solar and wind project rights-of-way (“ROW”), project permitting, rental payments and fees, and financial assurance obligations. The proposed rule would also affect ROWs granted for high-voltage transmission lines as well as large oil and gas pipelines. Interested parties have 60 days within which to comment.

Among the major changes, the proposed regulations would:

  • Establish competitive bidding procedures for granting solar and wind energy ROWs both within and without “designated leasing areas”;
  • Create new “variable offset” auction procedures, which appear to be modeled after the Bureau of Ocean Energy Management’s offshore renewable energy auction rules;
  • Establish a rental fee system based on acreage, estimated real property value, and the project’s presumed “encumbrance” of the value of federal land;
  • Institute an installed megawatt-based “capacity fee” as a proxy for collecting royalties;
  • Establish provisions for the assignment of interests in a ROW, much like an oil and gas lease; and
  • Create new provisions for cost recovery, transmission line ROWs, bonding/financial assurance, and site reclamation.

If adopted, the rule would have a significant impact on the future of renewable energy development, particularly in the American West, where much of the country’s prime solar and wind real estate is located.

One potentially contentious issue is BLM’s attempt to remake the ROW in the fashion of a mineral lease – something the agency may not have the authority to do. BLM has the authority to issue ROWs for renewable energy projects on federal land under the Federal Land Policy Management Act (“FLPMA”). While FLPMA requires annual rental payments of “fair market value” for a ROW across federal land, it does not authorize leasing or provide for royalty payments on electricity generated from a project sited on that ROW. Nevertheless, in addition to charging operators rent based on the “fair market value” of the land used for solar/wind projects, BLM is proposing to charge an additional “capacity fee” based on the project’s rated capacity to produce electricity. This capacity fee could be interpreted as an impermissible proxy for lease royalties, in excess of BLM’s authority to charge rent, which is normally based on the use of the land, and not on project revenues.

The full text of the proposal can be found at the following link: Leasing Public Lands for Solar and Wind Energy Development.

If the proposal was published in the Federal Register as planned on Sept. 30, interested parties will have until December 1 to submit their comments to the agency.

Beveridge & Diamond
www.bdlaw.com


Filed Under: News, Policy
Tagged With: bdlaw, BLM
 

About The Author

Paul Dvorak

Related Articles Read More >

US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe