Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

DNV GL starts Joint Industry Project to improve offshore site assessments

By Paul Dvorak | May 16, 2017

DNV GL invites industry partners to start a Joint Industry Project (JIP) for improving the collection and assessment of site conditions data for offshore wind farms. Aiming to increase the efficiency of collecting site conditions, the new JIP will work with stakeholders from across the wind industry. The knowledge generated from the JIP is planned to be ultimately incorporated in a DNV GL recommended practice.

DNV GL says that development of this recommended practice will create an industrial consensus on an agreed set of practices to follow for the analysis of offshore systems.

The design of an offshore wind farm is dependent on the quality of the calculated site conditions used to derive the design parameters. To achieve an optimal quality of data collection and assessment, extensive and costly investigations are needed at a very early stage of the development, long before a final investment decision is made. A recommended practice will allow stakeholders to improve their planning, investigation, and design.

“The development of this recommended practice will create an industrial consensus on an agreed set of practices to follow for the analysis of the system and its validation. This will allow stakeholders to increase transparency and reduce the risk in the early phases of the development,” says Kim Moerk, Executive Vice President for Renewables Certification at DNV GL.

Incorporating the experience and objectives of stakeholders along the wind energy value chain will add significant value for all parties involved. They will be able to contribute and influence the development of the assessment criteria to ensure their concerns are covered, practices are acknowledged and the objectives of all stakeholders are met. The involvement provides early access and insight into the results, ensuring participants are best prepared for its implementation.

Those interested in joining the JIP can contact the project manager Helena Hunt at Helena.Hunt@dnvgl.com.


Filed Under: Offshore wind, Policy
Tagged With: dnv gl
 

About The Author

Paul Dvorak

Related Articles Read More >

Maryland, North Carolina, Virginia collaborate to support offshore wind development
Greenbacker Renewable Energy acquires 15.3-MW Maine wind project
ACE NY urges support of the New York Renewables Protection Act
University of Arizona to fully power campus with wind, solar & storage

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe