Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Leadership
    • 2020 Winners
    • 2019 Winners
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Wind Power Videos
    • Wind Power Events
  • Webinars
  • Videos
  • Subscribe
    • Magazine Subscription
    • Enewsletter Subscription
  • About Us

DONG Energy to build UK’s largest offshore wind O&M hub

By Michelle Froese | September 22, 2016

DONG Energy announced plans for a multi-million investment to create the UK’s largest offshore wind operations and maintenance hub. Subject to planning approval, the new facility will be developed in the town’s Royal Dock and will initially support Westermost Rough, Race Bank, and Hornsea Project One offshore wind farms. However, it will have the capacity to support other east coast wind farms in DONG Energy’s future development pipeline.

dong

DONG Energy’s new the hub will be served by high-tech vessels capable of accommodating a crew of up to 60, providing 24/7 service, and remaining at sea for long periods.

By transforming the way wind farms are supported, the hub will be served by high-tech vessels capable accommodating up to 60 crew and technicians, while remaining at sea for long periods. The hub will also include a comprehensive marine coordination centre capable of providing 24-7 service to offshore operations across the UK and beyond.

“This new operational hub in Grimsby will be a game-changing industry first, raising the bar for the way we serve offshore wind farms,” said Brent Cheshire, UK Country Chairman of DONG Energy. “It will generate direct and indirect job opportunities in the Humber region, as well as opportunities for the local supply chain.”

He added: “It represents a massive vote of confidence to the UK offshore wind industry and confirms our commitment to the Humber region where by 2019 we expect to have invested around GBP 6 billion.”

The new hub will sit alongside the existing Westermost Rough operation and maintenance facility, using additional land to be leased from Associated British Ports.

State-of-the-art service operational vessels (SOVs), supplied by Ostensjo Rederi and designed by Rolls-Royce, are being chartered to operate from the new hub. The first vessel will arrive late next year to support a phased activation on the new hub.

The vessel will initially support the O&M of Race Bank, DONG Energy’s 580-MW offshore wind farm currently under construction 17 miles off the Norfolk and Lincolnshire coastlines.

 

Tell Us What You Think! Cancel reply

Related Articles Read More >

US Wind begins oceanographic surveys for Maryland offshore lease area
Industry requests larger offshore wind infrastructure budget in letter to Congress
Ingeteam introduces a new robust wind controller firmware development methodology
GE to supply turbines to Invenergy’s 1.4-GW wind portfolio in Oklahoma

Windpower Engineering & Development Digital Edition

Digital Edition

Browse the most current issue of Windpower Engineering & Development and back issues in an easy to use high quality format. Clip, share and download with the leading wind power engineering magazine today.

Webinars
Windpower Engineering & Development
  • Wind Articles
  • Subscribe to Windpower Engineering
  • Advertising
  • Contact Us/About Us

Copyright © 2021 WTWH Media, LLC. All Rights Reserved. Site Map | Privacy Policy | RSS

Search Windpower Power Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Leadership
    • 2020 Winners
    • 2019 Winners
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Wind Power Videos
    • Wind Power Events
  • Webinars
  • Videos
  • Subscribe
    • Magazine Subscription
    • Enewsletter Subscription
  • About Us