Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Fugro wins cable installation contract at Rampion Offshore Wind Farm

By Michelle Froese | September 8, 2015

Fugro Saltire trenching and cable-lay vessel.

Fugro’s Saltire trenching and cable-lay vessel.

Fugro has secured a contract for the installation and burial of 122 array cables at the Rampion Offshore Wind Farm being built in the English Channel, located 13 kilometers off the Sussex coast. The contract was awarded by E.ON, alongside the UK Green Investment Bank.

The engineering and planning will start immediately with installation carried out in two phases in 2016 and 2017.

Fugro will lay and bury the cables with its construction and installation vessels Fugro Symphony and Fugro Saltire using one of its two Q1400 trenching systems to bury the cables. The array cables will be pulled in and laid between the wind turbines and the offshore substation where the power is then transmitted onshore.

“The award of this contract has strengthened Fugro’s successful working relationship with E.ON and comes soon after finishing cable-lay and burial on E.ON’s recently completed Humber Gateway Wind Farm,” said Derek Cruickshank, Managing Director, Fugro Subsea Services Ltd. “Subsea installation and trenching systems are amongst Fugro Subsea’s specialist services and our focus on offshore energy is supported by a team of highly experienced onshore and offshore personnel.”

The Rampion Offshore Wind Farm will consist of 116 turbines, each with a generating capacity of 3.45 MW. Construction is expected to be completed in 2018.

Fugro
www.fugro.com


Filed Under: Cables & connectors, Offshore wind, Projects
Tagged With: cable, Fugro, offshore, power, trench, wind
 

About The Author

Michelle Froese

Related Articles Read More >

US government allows Empire Wind offshore project to resume construction
Overlooked and underleveraged: Why ‘lite repowering’ is wind energy’s best near-term bet
79 aging wind turbines brought back online throughout Texas panhandle
Data center signs 166-MW PPA with Las Majadas Wind in Texas

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe