Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

GE Power Conversion helps to build the future of wind power efficiency

By Nic Sharpley | June 6, 2013

Wind turbine developers will soon have open access to a £50 million testing facility in the U.K. based on unique and leading-edge technology. The state-of-the-art facility has been specifically designed for full-scale testing of large nacelles. GE’s Power Conversion lets them develop and build the next generation of wind turbines that will be increasingly efficient, reliable, and cost-effective.GE

This wind turbine test platform is being built at the National Renewable Energy Centre (NAREC). It is designed to allow manufacturers to speed up the development time of their systems. In order to achieve this, a tailor-made, 35-meter-high, 3,000-sq.-meter facility to house the test rig was constructed on designs letting it be capable of handling the performance, endurance, and compressed life testing of complete nacelles (the unit at the top of the tower housing the electricity generation system).

The installation that GE has designed and will commission is comprised of the direct-drive, permanent magnet motor, one of the first of its kind, which will run at up to 30 rpm and with a maximum force of 14.3 million NM (Newton Meter), resulting in a power of over 20,000 hp, which is equivalent to the driving power of 150 passenger cars.

GE is responsible for the turnkey package for the test facility from the grid supply to the motor shaft, including a heavy-duty, medium-voltage drive system and comprehensive automation and visualization equipment, as well as overlooking the overall installation with the wind load simulator.

The Energy Technologies Institute (ETI) is investing £25 million in the NAREC facility, through the design, development, and commissioning of the test rig by GE Power Conversion and MTS Systems Corporation. It is a public-private partnership between global energy and engineering companies and the U.K. government to bring together engineering projects that accelerate the development of affordable, secure, and sustainable technologies.

NAREC has invested more than £125 million of U.K. government, private sector, and European Union funding to create a unique integrated portfolio of testing and research facilities for renewable energy, operated on an open-access commercial basis in Blyth, Northumberland, England.

The NAREC test facility is the largest independent open-access facility for the testing of wind turbine drivetrains in the world. The FAS (Force Application System) is being provided by GE’s consortium partner—MTS Systems Corporation of Minneapolis. Its equipment is one of the largest in the world of its type and incorporates an unsurpassed hydraulic/mechanical system to apply forces to the mechanical assembly of the wind turbine, as seen in the real installation, such as, by wind forces at an offshore installation.

The 15-MW permanent magnet motor, serving as the main driver to emulate the wind speed, with a rating of 20,000 hp, has been developed and supplied by GE, Rugby, and features superior dynamics in conjunction with the controls, supplied by GE, Berlin. Due to its mere size with a diameter of 8 meters and an approximate weight of 330 tons, it was assembled on-site. The pre-fabricated elements are being shipped to the NAREC site and the remaining assembly work carried out in situ by GE.

GE Power Conversion
www.gepowerconversion.com


Filed Under: Nacelle, News, Safety
Tagged With: GEPowerConversion
 

Related Articles Read More >

US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe