Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

GE to install first Haliade-X 12-MW offshore turbine prototype

By Michelle Froese | January 16, 2019

GE Renewable Energy and Future Wind (a Joint Venture between Pondera Development and SIF Holding Netherlands) announced that they have signed an agreement to install the first Haliade-X 12-MW wind turbine prototype in Maasvlakte-Rotterdam (NL) during summer 2019. The deal includes five years of testing and a 15-year full service Operation and Maintenance agreement.

GE Haliade X

The Haliade- X will host 220-meter rotor blades and tower 260 meters over the sea — that’s more than five times the size of the iconic Arc de Triomphe in Paris, France.

This Haliade-X 12 MW prototype will be installed onshore to facilitate access for testing. During the initial period of operations, it will allow GE Renewable Energy to collect data needed to obtain a Type Certificate, a key step in commercializing the product in 2021.

“We are proud that GE Renewable Energy and SIF are using our port as a test location to develop the most powerful offshore wind turbine in the world,” said Allard Castelein, CEO of the Port of Rotterdam. “It confirms the port’s reputation and validates our focus on being an attractive partner for the offshore wind industry as it drives the energy transition.”

The nacelle of the Haliade-X 12MW prototype will be assembled in Saint-Nazaire (France), while the three 107 meter-long LM Wind Power blades will be manufactured in Cherbourg (France), and the tower sections will be produced in Seville (Spain). All components will be shipped to Rotterdam, where pre-assembly work and installation will take place.

This prototype in Rotterdam is part of the $400 (€320) million investment in the Haliade-X development announced by GE Renewable Energy in March 2018 to help reduce offshore wind’s cost of energy in order to make it a more competitive source of clean, renewable energy.

“As we rapidly progress on assembling the Haliade-X prototype, this announcement is a critical step forward for GE and our customers,” said John Lavelle, VP & CEO of Offshore Wind at GE Renewable Energy. “The port of Rotterdam has been a real partner and provides all the necessary conditions to test the Haliade-X in the most drastic weather conditions”.


Filed Under: News, Projects, Turbines
Tagged With: gerenewableenergy
 

About The Author

Michelle Froese

Related Articles Read More >

Equinor launches ECO Liberty service operations vessel for Empire Wind offshore project
Triton Anchor receives U.S. patents for offshore anchor
US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe