Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Iberdrola Renewables files potential wind project with Green Mountain Power

By Joshua Smalley | July 7, 2015

The Deerfield project would be built near the existing Searsburg wind project (pictured), in Readsboro and Searsburg.

Iberdrola Renewables recently announced the filing of a potential 25-year contract to supply Vermont’s largest utility, Green Mountain Power (GMP), with wind energy from the permitted Deerfield Wind Farm. GMP would purchase 30 MW from the wind farm, under the contract submitted today to the Vermont Public Service Board for review.

The Deerfield project would be built near the existing Searsburg wind project, in Readsboro and Searsburg. The project would include 15 wind turbines, eight in Searsburg and seven in Readsboro, which would produce enough energy to power about 14,000 average Vermont households. The towns combined would receive more than $400,000 in direct annual payments, totaling approximately $7.8 million during the life of the proposed power agreement. Additionally, the project would generate an estimated $300,000 in direct tax payments per year for the State of Vermont, which add up to more than $6 million over 20 years.

“This filing represents a key milestone in moving forward with the Deerfield wind project, and it is good news for Vermonters who support renewable energy and for ratepayers who want competitively-priced power,” said Gov. Peter Shumlin. “Going forward, we know we need all renewable energy sources on the table, including wind, if we are going to meet our state energy goals and have a livable planet for our kids and grandkids. While most of Vermont’s wind projects have been located in the Northeast Kingdom, I am encouraged that through the Deerfield project Southern Vermont will be contributing to our fight against climate change.”

“Providing stable, affordable and highly reliable power in our power portfolio is a top priority for Green Mountain Power and this purchase agreement will ensure we can achieve these important goals for years to come,” said GMP’s General Counsel and Vice President of Power Resources, Charlotte Ancel.

“We’re grateful Iberdrola Renewables is moving closer to bringing Deerfield Wind to fruition,” said Readsboro Selectman Teddy Hopkins. “Like many parts of Vermont, we have a small tax base, and not much ability to attract investments of this size, so the local financial windfall would generate benefits for years to come, benefitting all the taxpayers here in Readsboro.”

“The project will benefit the taxpayers in Searsburg for many years and will provide lots of work for area contractors as well,” said Searsburg Selectboard Chair Sandy Gaszek.

“Partnering with GMP to offer stably-priced and locally-generated power will benefit Vermont customers for years,” said Barrett Stambler, Iberdrola Renewables’ vice president.

Deerfield could begin construction, pending reviews by various Vermont state agencies, in 2016.

Iberdrola Renewables
iberdrolarenewables.us/


Filed Under: News, Projects
Tagged With: Green Mountain Power, iberdrola renewables
 

Related Articles Read More >

Federal judge says Trump’s offshore wind blockade is illegal
LS Power acquires BP Wind Energy North America onshore wind business
First utility-scale wind farm in Arkansas now online
51% of forecasted US wind capacity expected to come online in Q4

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe