Lincoln Electric and Ventower Industries signed a $3.2 million contract today at the AWEA Windpower 2010 conference. Lincoln Electric will supply two installments of Lincoln Electric welding power sources and accessories to Ventower’s new Michigan facility. Ventower Industies new tower manufacturing facility will be stocked solely with the most technologically advanced Lincoln Electric equipment.
Filed Under: Uncategorized