Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Nordex awarded contracts for 64.2 MW for Turkey

By WPED Contributor | July 22, 2014

Nordex has received three contracts for the installation of its N117/2400 and the N117/3000 turbines in Turkey, totalling 64.2 MW.

The company will be supplying to the new customer Erdem Holding seven N117/3000 Generation Delta turbines for the “Odemis” wind farm. This order also includes a premium-service contract for a minimum period of five years.

The wind farm “Odemis” is located south east of Izmir, close to the Aegean coast of Turkey. The N117/3000 will be installed with a hub height of 91 metres. The rotor blades, towers and anchor cages will be produced in Turkey. Under the Turkish feed-in legislation, this will enable Erdem Holding to claim a higher feed-in tariff for the project.

Nordex turbine

The wind farm “Odemis” is located south east of Izmir, close to the Aegean coast of Turkey.

“Odemis” is the first wind farm project executed by Erdem Holding, a group active in telecommunications, construction, natural gas distribution, production and recycling, which is now diversifying into energy production and renewable energies.

In order to expand its 30 MW “Edincik” wind farm to 56.4 MW, Nordex` regular customer Edincik Enerji ordered eleven N117/2400 turbines designed for light wind sites. With the expansion of the wind farm located on the southern coast of the Marmara Sea, Edincik Enerji is executing its second project with Nordex. Back in 2010 and 2012, the customer had ordered Nordex turbines for wind farms in the same region. The contract includes a Nordex premium service agreement for six years.

The third new signed contract is the extension of the existing 25 MW Bandirma III wind farm of the customer Bursa Temiz Enerji. Seven N117/2400 turbines will expand the wind farm close to the port city of Bandirma in the Marmara Region to 41.8 MW. The extension of “Bandirma III” is the second wind farm project from Bursa Temiz Enerji with Nordex.

Nordex
www.nordex-online.com


Filed Under: Construction, News

 

About The Author

WPED Contributor

If you would like to contribute to Windpower, please contact us: https://www.windpowerengineering.com/meetourteam/

Related Articles Read More >

US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe