Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Nordex to repower German wind farm

By Michelle Froese | June 27, 2016

Although the number of turbines installed at the wind farm 18 years ago will drop by almost half, yield is expected to more than double.

Although the number of turbines installed at the Cuxhaven wind farm 18 years ago will drop by almost half, yield is expected to more than double.

Nordex will be replacing 16 legacy N60/1300 wind turbines with nine modern N117/3000 ones for PNE Wind AG by the end of 2016. Located near Cuxhaven in Germany, the Altenbruch I wind farm will be undergoing what in Germany is seen as a business model offering considerable potential for the future: repowering.

In 2015, repowering accounted for 18% of all new installations in Germany. The Altenbruch project is a good example showing the purpose of repowering. Although the number of turbines installed at the wind farm 18 years ago will drop by almost half, yield is expected to more than double.

“In Germany it is important to increase the output of existing wind farms and to simultaneously reduce the number of wind turbines. Looking forward, this will become even easier to do as we will be continuing to increase the installed capacity of our Delta series, thus making the system even more efficient,” says Jörg Hempel, who is in charge of Nordex’s business in Germany.

Further advantages of modernizing wind farms include increasing full-load hours, improving grid compatibility and significantly lowering rotor speeds and noise emissions. With a hub height of 91 meters and a total height of 149.9 meters, the new wind turbines will be going on line this year.


Filed Under: News, Projects
Tagged With: Nordex
 

About The Author

Michelle Froese

Related Articles Read More >

US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition

Digital Edition

Browse the most current issue of Windpower Engineering & Development and back issues in an easy to use high quality format. Clip, share and download with the leading wind power engineering magazine today.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe