Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

North Dakota College installs new wind tech training tower

By Michelle Froese | October 6, 2016

North Dakota’s Bismarck State College (BSC) announced successful installation of a new tower to provide training and education to students and wind industry partners. The “Nacelle Tower” is located on the west lawn of the National Energy Center of Excellence on the BSC campus.

Students began using the Nacelle Tower in September

Students at BSC began training using the Nacelle Tower in September. At 32 feet hight, it is lower than most wind towers in the industry, but means students can learn in a safer, more controlled environment.

The top of the Nacelle Tower is 32 feet high, and the interior hub hatch stands at a height of 24 feet. The tower replicates the top portion of a commercial wind tower, which typically houses the generating components of the turbine.

In a commercial setting, the nacelle is approximately 300 feet tall. But the lower height of the Nacelle Tower on the BSC campus lets students and industry practice different scenarios in a controlled environment.

“Grants and partnerships with industry really enhance our ability to get students prepared to hit the ground running upon hire,” said Dr. Larry C. Skogen, BSC President. “Ensuring our students are well prepared for the workforce, and helping companies train their employees is work we are very proud to do.”

BSC, the North Dakota Department of Commerce, Montana-Dakota Utilities, Minnesota Power, and NextEra Energy celebrated the tower’s completion.

“It has been said that ‘Success is where preparation and opportunity meet.’ This new training facility will not only allow the students and our employees to learn to safely use their equipment and the critical techniques in a controlled environment, but it offers a cost effective way for them to acquire the repetitions that are vitally needed to be prepared,” said Alan Welte, Director of Generation for Montana-Dakota Utilities Co.

The Nacelle Tower project began in 2014 after a request from industry to create a place that wind technicians could use for safety, rope, and rappelling training. Montana-Dakota Utilities and Minnesota Power each contributed $30,000 towards the project. A North Dakota Department of Commerce Workforce matching grant was then secured for an additional $60,000.

“Since 2007 over $6.4 million has been awarded to the four colleges across North Dakota. Twenty-nine different projects have been funded and over 3300 students and employees have received training, which leads to employment in high demand and high wage jobs,” said Wayde Sick, Director of ND Department of Commerce Workforce Division.

He added: “Projects not only include this tower, but Workforce Enhancement Grants have funded various healthcare, energy, manufacturing, automotive and precision agriculture training programs across the state.”

With over half of the funds raised for the project, BSC continued pursuing additional funds when NextEra Energy came forward, matching the other industry donations of $30,000.

“NextEra Energy Resources is pleased to support the Bismarck State College National Energy Center of Excellence Nacelle Tower. Training on the Nacelle Tower presents students an opportunity to train on state-of-the-art equipment that will prepare them to be safe and skilled wind energy professionals. Congratulations BSC for implementing the training tower,” said James Auld, Director of External Training Initiatives for NextEra Energy.

Two additional funding sources were secured through the Energy Generation Conference board and through a grant from the U.S. Department of Labor known as Training for Regional Energy in North Dakota. CW Structural and EAPC helped design the project, and Capital City Construction was used for the construction.


Filed Under: News, Safety, Towers, Training
Tagged With: nexteraenergy
 

About The Author

Michelle Froese

Related Articles Read More >

US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition

Digital Edition

Browse the most current issue of Windpower Engineering & Development and back issues in an easy to use high quality format. Clip, share and download with the leading wind power engineering magazine today.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe