Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Powin Energy powers up 2 MW, 8 MWh energy storage system for critical grid support in California

By Paul Dvorak | February 2, 2017

Powin Energy says its 2 MW, 8 MWh Battery Energy Storage System (BESS) in Irvine, California, is officially online. The Millikan Ave. BESS provides emission-free and highly reliable critical peaking capacity and grid support services to Southern California Edison (SCE). Powin Energy developed the project and manufactured, installed, and commissioned the system in less than six months from the date the project was awarded, an industry first for an energy storage asset of this size on a distribution system.

Renewable energy generation can be an inconsistent business. From managing ramp rate control to mismatches in peak production and demand, wind and solar facilities can leverage the flexibility and control the Powin BESS provides.

“The natural gas and resulting capacity shortages due to the Aliso Canyon emergency shutdown necessitated that we bring this project online by the end of 2016. I am so impressed by our team’s performance on this project – everyone worked long hours over the holidays to meet this incredibly short project timeline,” said Geoff Brown, President of Powin Energy. “This also would never have been possible without the support of our project partners at HMT Electric and Eaton. I’d also like to thank SCE and the City of Irvine for their extensive support completing this interconnection and permitting process in record time.

“This project’s success was essential for Powin. It allowed us to demonstrate how quickly our system can be deployed and how our bp-OS software eliminates many of the hardware components that other battery vendors use for calibration and balancing. We strongly believe that deploying grid support resources in months rather than years and at a fraction of the cost of a gas peaker plant presents the power industry with an attractive alternative to serve their peak capacity needs.”

The Powin Energy BESS is interconnected on the Virgo 12 kV distribution line out of the Estrella 66/12 kV substation and can deliver 2 MW of power for over four continuous hours, providing a reliable and continuous source of energy during peak demand events. In addition, the system will supply regulation and flexible capacity support as needed. The storage system consists of over 2,400 Li-ion battery packs, each containing 3.7 kWh of lithium iron phosphate prismatic modules. Eaton provided the power converter, transformers, and switchgear. Powin Energy’s project was selected through a competitive solicitation initiated in response to the California Public Utilities Commission’s (CPUC) Aliso Canyon Energy Storage (ACES) request for energy storage systems that could be operational by the beginning of 2017.


Filed Under: Energy storage, News
Tagged With: Powin Energy
 

About The Author

Paul Dvorak

Related Articles Read More >

US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition

Digital Edition

Browse the most current issue of Windpower Engineering & Development and back issues in an easy to use high quality format. Clip, share and download with the leading wind power engineering magazine today.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe