Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Quinbrook to repower California wind farm

By Michelle Froese | February 5, 2018

Wind farm repowering

Scout plans to replace the existing 1980s vintage wind turbines with the latest modern turbine technology that is expected to increase renewable power output as much as sevenfold.

Following a competitive solicitation run by the State of California, Quinbrook Infrastructure Partners‘ Low Carbon Power Fund has been awarded a new long-term lease to repower the Gonzaga Ridge Wind Farm in Pacheco State Park in central California.

The project rights were won and the lease was secured by Scout Clean Energy, a Colorado-based developer and operator of U.S. wind power projects and a Quinbrook portfolio company. Quinbrook Infrastructure is a global investment manager specializing in lower carbon and renewable energy infrastructure.

The lease awards Scout the exclusive right to build, own, and operate a new wind farm project at the Gonzaga site, a major investment project that is projected to increase the production capacity of the wind farm from 16.5 MW to an expected 65-80 MW.

Scout plans to replace the existing 1980s vintage wind turbines with the latest modern turbine technology that is expected to increase renewable power output as much as sevenfold.

“This iconic project represents an exciting opportunity to help the state of California meet its ever-increasing renewable energy needs,” said Michael Rucker, CEO of Scout Clean Energy. “By repowering Pacheco Pass and equipping it with today’s advanced wind-turbine technology, we hope to set a new and important precedent for unlocking more renewable power from recycling older existing wind power sites located across California and other US states with cost-effective new capacity. This is truly a getting ‘more for less’ proposition.”

California Senate President Kevin de León set forth a plan last year that would gradually increase renewable energy consumption in the state, culminating in a goal to produce 60% renewable energy within California’s electricity grid by the year 2030. State policies in the California market, as well as in the Mid-Atlantic and Northeast regions, are expected to drive demand for more than 30 GW of new renewable energy capacity between now and 2030.

“Gonzaga Ridge’s unique location near the Bay Area, as well as its connectivity to major distribution points on California’s electricity grid, provide a rare opportunity to improve the productivity of a vintage wind farm that is a part of the history of renewable energy in the State,” said Shawn Cumberland, Senior Managing Director of Quinbrook. “As the original project was ‘cutting edge’ when first built in the ‘80s, the repowering of Gonzaga will demonstrate how far U.S. wind power has come in the past three decades.”

The new project will connect to the grid at in the California Independent System Operator’s NP15 zone, a major distribution point and market hub for Northern California. The wind farm will continue to provide royalty revenues to the California Department of Parks and Recreation to fund the operations of the park and related support functions.

“Modern turbines are both larger in size and much more cost-effective than their predecessors,” said Cumberland. “The continued declines in the cost of wind power is helping to keep power prices low whilst at the same time helping California achieve its emissions reduction goals.  Quinbrook is proud to play our part in California’s groundbreaking energy transition.”


Filed Under: News, Projects
Tagged With: quinbrook
 

About The Author

Michelle Froese

Related Articles Read More >

US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition

Digital Edition

Browse the most current issue of Windpower Engineering & Development and back issues in an easy to use high quality format. Clip, share and download with the leading wind power engineering magazine today.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe