Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Siemens Gamesa to supply 22 turbines at two wind farms in Spain

By Michelle Froese | December 20, 2017

Siemens Gamesa Renewable Energy (SGRE), a top wind-turbine OEM in Spain, has secured an order from Gas Natural Fenosa Renovables. The contract is for 22 turbines, delivered to two wind farms with a combined capacity of 64 MW. Both wind farms are the result of the renewable power capacity allocated to the energy company in the auction held by the Spanish government last May.

SGRE wind farm

These wind farms are part of the renewable power capacity allocated to Gas Natural Fenosa Renovables in the auction held by the Spanish government last May

The first order encompasses the installation of 15 of its G126-2.625 MW turbines, while the second covers the supply of seven of its G132-3.465 MW turbines — including one of SGRE’s newest models, which features 64.5m-long glass fibre blades.

These orders mark the first time both models will be installed in commercial wind farms in Spain. The two prototypes were validated and certified at the R&D wind farm located in the Alaiz mountain range (Navarra, Spain).

In both instances, most of the parts will be made in Spain: the blades will be manufactured at the Aoiz factory in Navarra and the nacelles will be produced at the Ágreda plant in Soria. The wind turbines are scheduled for delivery during the third quarter of 2018, while the facilities are slated for commissioning towards the end of next year.

Siemens Gamesa’s relationship with Gas Natural dates back to 1997, since which time the company has supplied the Spanish power utility with over 700 MW, most of which in Spain and Mexico.

With a market share of over 55%, Siemens Gamesa is Spain’s number-one OEM, having installed more than 13,000 MW nationwide to date. In addition, the company services more than 7,500 MW, around one third of total installed capacity in Spain.


Filed Under: News, Projects, Turbines
Tagged With: siemensgamesa
 

About The Author

Michelle Froese

Related Articles Read More >

Trump admin ‘pauses’ leases for five offshore wind projects already under construction
US to install 36% more wind turbines in 2025 than previous year
Federal judge says Trump’s offshore wind blockade is illegal
LS Power acquires BP Wind Energy North America onshore wind business

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2026 Arrowfly LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Arrowfly
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe