Acting on behalf of developer Energiekontor, a renewable energy and infrastructure consultancy, Natural Power has been appointed as Owner’s Engineer for the construction phase of Withernwick Wind Farm Extension, located in the East Riding of Yorkshire. Cheetham Hill Construction Ltd. has started the balance of plant construction work on site this month, and the project is…
Energiekontor reveals the best way to increase wind farm production
Energiekontor started to perform an extensive testing campaign which included, measurement of the overall impact loads on blade root after coupling the RBE
NerWind Service provides turbine optimization through advanced control systems
Targeted component upgrades and adjustments to the way turbines are operated can unlock significant value for wind farm owners and operators. turbine optimization
GE celebrates 25,000 turbine installations
Powering the people who power the world, GE recently celebrated its 25,000th wind turbine installation—a milestone for the company which now has more than 38 GW of installed wind turbines around the world. Altogether, GE’s 25,000 wind turbines generate the equivalent energy needed to charge 25 billion smartphones, or provide the electricity needed for approximately…