Gamesa’s G128-5.0 MW offshore turbine, installed off Arinaga Quay (Gran Canary Island), generated more power in August (3,136 MWh) than any other Spanish turbine has ever generated in a month. This milestone was possible thanks to the tremendous reliability of this model, capable of withstanding the regional trade winds typical at this time of the…
Gamesa signs two new contracts for the supply of 214 MW of its turbines in Brazil
The agreement with CER includes the manufacture, supply, transport, installation and commissioning of 83 G97-2.0 wind turbines, as well as the civil works at Assuruá I, Assuruá VI, Capoeiras I, Capoeiras II, Curral de Pedras III and Curral de Pedras IV wind farms in the Xique-Xique II complex being developed in the state of Bahia.…
Gamesa showcases its G132-5.0 MW offshore turbine at Glasgow show
Gamesa is showcasing its new 5.0 MW turbine, the G132-5.0 MW, at the 2014 Global Offshore Wind trade fair, one of the sector’s hallmark events, in Glasgow on June 11 and 12. The new G132-5.0 MW turbine leverages the know-how and experience acquired during the exhaustive validation of the 5.0 MW platform, which culminated recently…