A modular seven-piece blade will cost less to transport than long one-piece blades of the same length. And there are no special requirements for assembling it on site. At the recent Sandia Wind Turbine Blade Workshop, blade design firm Wetzel Engineering, (www.wetzelengineering.com) also said the seven piece design will be less expensive to build and…