Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Testing center opens for turbines of all sizes

By Steven Bushong | March 4, 2014

West Texas A&M University and UL have opened a turbine testing facility on 480 acres in Canyon, Texas. The Advanced Outdoor Wind Test Facility will provide services for manufacturers of large, small, and micro-scale wind turbines, as well as research and design testing.

 Turbines will soon replace the crane along the skyline of Canyon, Texas.

Turbines will soon replace the crane along the skyline of Canyon, Texas.

The facility lies in the middle of the Great Plains Wind Corridor, where favorable wind blows all year. The good conditions will help companies receive quick turnaround on tests. The facility can accommodate temporary and long-term installations, a benefit to manufacturers whether testing blades, generators, inverters, software, or some combination.

The facility is staffed full-time by engineers, technicians, and a machinist, and has the equipment necessary to install small and medium-sized turbines, including foundations. The site features an indoor space for instrumentation and troubleshooting. A data acquisition system will provide customers real-time data for their turbine, accessible by a website.

The facility is capable of testing for various standards, including UL 6141 and 6142, International Electrotechnical Commission (IEC) certification, and Small Wind Certification Council (SWCC) certification.

The facility will use an array of sensors to tell wind speed, wind direction, temperature, output voltage, current, and power, as well as acoustic measurements. UL commissioned the first turbine for tests in December 2013, and more manufacturers are in the pipeline.

UL and West Texas A&M University will partner at that facility with the DEWI Group. DEWI was acquired by UL in 2012. DEWI-OCC is a generally accepted certification body for land-based and offshore wind turbines and their components.

The benefits of the test site will extend to the university where it’s located. “WTAMU will become a green campus as we produce power from the wind turbines we test,” says laboratory director Adam J. Holman. WPE


Filed Under: News, Turbines
Tagged With: UL
 

Related Articles Read More >

Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards
US wind market has worst install year since 2013

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition

Digital Edition

Browse the most current issue of Windpower Engineering & Development and back issues in an easy to use high quality format. Clip, share and download with the leading wind power engineering magazine today.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe