Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

ACCIONA wins 52 MW of wind capacity in Mexican auction

By Michelle Froese | November 28, 2017

ACCIONA Energía has been awarded 52.04 MW of capacity in the third long-term auction held in the Mexican wholesale electricity market. As confirmed in the presentation of the definitive results of the tender called by the Secretary of State for Energy (SENER) and the National Energy Control Agency (CENACE) of Mexico.

The newly awarded capacity will be provided to the grid by the El Cortijo Wind Farm, owned by the company. It is currently being built in the State of Tamaulipas and will come on stream in the third trimester of 2018.

This capacity will be provided to the grid by the El Cortijo Wind Farm, owned by the company. It is currently being built in the State of Tamaulipas and will come on stream in the third trimester of 2018.

El Cortijo is being built as a result of the first long-term power tender organized in Mexico, in which ACCIONA was awarded 585.7 GWh of energy and the associated clean energy certificates (CELs). With the latest award, the company will receive revenues under the three remuneration parameters envisaged in the legislation that regulates these tenders.

ACCIONA Energía will receive a total of 486.3 million pesos (approximately $26 million USD at current exchange rates) over the 15-year contract period for guaranteed power in El Cortijo.

ACCIONA Energía Mexico Director Miguel Angel Alonso expressed his satisfaction, “we have achieved this in the three auctions held in the country to date, and this shows that we are aligned with the Mexican Government’s development targets envisaged in its Energy Reform.”

The El Cortijo wind farm, located 40 kilometers south of Reynosa, will eventually have a capacity of 183 MW (15 MW more than initially planned), with 61 3-MW wind turbines of Nordex ACCIONA Windpower technology.

ACCIONA will soon begin the construction of the Puerto Libertad photovoltaic plant in Sonora, partly the result of the award made in the second energy auction held in Mexico, in which the company obtained 478.3 GWh together with the associated CELs.

The company has operated 556.5 MW in Mexico under its ownership for some years (four wind farms in Oaxaca) and has built another 303 MW for other customers.


Filed Under: News, Projects
Tagged With: accionaenergia
 

About The Author

Michelle Froese

Related Articles Read More >

Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards
US wind market has worst install year since 2013

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition

Digital Edition

Browse the most current issue of Windpower Engineering & Development and back issues in an easy to use high quality format. Clip, share and download with the leading wind power engineering magazine today.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe