Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Global Wind Service to install GE Haliade offshore prototype in Denmark

By Michelle Froese | March 17, 2016

GE-Haliade-150-at-Belwind-1200x628

With a 150-meter diameter rotor and blades stretching 73.50 m, GE’s Haliade turbine has a yield 15% better than existing offshore turbines.

Global Wind Service (GWS) announced it will install the Haliade 150 offshore wind-turbine prototype at the National Test Center for Large Wind Turbines in Osterild, Denmark.

GWS have been given the opportunity to further expand its knowledge within the technological platform of GE and, therefore, will be well prepared for future GE offshore projects.

“GWS has been awarded the Installation contract for our Osterild project based on the good experience we had with this company at the Belwind project in 2013,” said GE Project Manager Elsa-Laure Rondeleux. “GWS was able to propose a full package for installation and manpower with crane partner BMS. This project is aim to be good training for further collaboration, notably for GE’s next project: Block Island in the US.”

A full installation team from GWS and a group of BMS Heavy Crane operators will be responsible for full crane and installation scope, including lifting supervision and mechanical and electrical installation. BMS will use their giant LR 11350 crane, with power boom and a 160 ton crawler, to help with the installation of the prototype.

“GWS have previously worked with the Haliade 150 turbine in 2013 at the Belwind site together with our related company Fred. Olsen Windcarrier. We look forward to working with this turbine again and to strengthening our relationship with GE even further,” said GWS Chief Commercial Officer, Michael Olsen.


Filed Under: News, Offshore wind, Turbines

 

About The Author

Michelle Froese

Related Articles Read More >

Trump admin ‘pauses’ leases for five offshore wind projects already under construction
US to install 36% more wind turbines in 2025 than previous year
Federal judge says Trump’s offshore wind blockade is illegal
LS Power acquires BP Wind Energy North America onshore wind business

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2026 Arrowfly LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Arrowfly
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe