Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

World’s most powerful wind turbine now operational

By Paul Dvorak | January 30, 2014

Vestas’ first V164-8.0 MW prototype wind turbine has successfully produced its first kWh of electricity, making it the worlds’ most powerful turbine in operation. 

With a 140-m tower, the turbine at Østerild has a tip height of 220m.

With a 140-m tower, the turbine at Østerild has a tip height of 220m.

“We have now completed the production, testing, and installation of the V164-8.0 MW as planned, thanks to the team’s intense effort during a time when Vestas has reduced its investments and lowered fixed costs. We now look forward to evaluating the turbine’s performance on site,” says Vestas’ Chief Technology Officer Anders Vedel.

The turbine, installed at the Danish National Test Centre for Large Wind Turbines in Østerild, will be closely monitored in the coming months to further validate reliability and energy output. The turbine’s installation is a key milestone towards ensuring maximum business case certainty for customers investing in offshore wind. The V164-8.0 MW will be the flagship product for the offshore joint venture between Vestas and Mitsubishi Heavy Industries.

“The V164-8.0 MW delivers industry-leading power output, based on Vestas’ proven technology solutions. Combined with the experience and capabilities of both Vestas and Mitsubishi Heavy Industries, this puts us in a strong position in the growing offshore market,” says Vestas Offshore President Jens Tommerup.

With a 140-m tower, the turbine at Østerild has a tip height of 220m. The swept area of more than 21,000 m2, equal to three football pitches, increases the amount of energy captured, while reducing operational and maintenance costs by enabling customers to run fewer, larger turbines, with fewer service visits.

Given the necessary pipeline of orders, serial production of the V164-8.0 MW turbine can begin in 2015.


Filed Under: News, Offshore wind
Tagged With: Vestas
 

About The Author

Paul Dvorak

Comments

  1. khorsandi says

    January 31, 2014 at 12:26 pm

    we started for manufacture 2.5 mw in iran acc. licence of furlander co. the vestas is pioneer in wind turbine

Related Articles Read More >

Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets
Equinor halts work on Empire Wind offshore project after federal government order
ARESCA wants input on offshore wind standards
US wind market has worst install year since 2013

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition

Digital Edition

Browse the most current issue of Windpower Engineering & Development and back issues in an easy to use high quality format. Clip, share and download with the leading wind power engineering magazine today.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe